Tag Archives: Dynamat

Off to Paint (June 25, 2016)

Work in May and June has been geared towards getting the car ready to go to the body/paint shop.  There will still be work to do after the paint (re-assemble all exterior pieces, prep and install firewall extensions, wheel wells, door sills, carpeting, etc.).  However, getting the car to paint is a major milestone.

I completed the metal duct work in front of the radiator.  FFR provided no guidance regarding how to fit these pieces.  I may want to add a fan shroud later to maximize air flow through the radiator.1 radiator metal2 radiator metal

With the hood up, engine is looking splendid.  Sounds great too.

I set the rear hatch glass in place.  My son Zach helped adjust the u-bolt to catch the lock handle.  The FFR manual says to bolt the struts to a chassis tube.  But that is difficult because at this stage the tube is hidden under the fiberglass body and the metal sides of the hatch.

I fitted the headlight covers.  The plexi provided is over-sized and I spent an entire day gently grinding down the edges to make the fit as nice as possible.  Here the covers are fitted with clecos.  I will have to remove them before paint.

I removed the body (which required removing the side pipes, and seats) so I could do a few more things:  added weather-stripping where the body sits on the chassis, added Dynamat sound barrier to the ceiling (to be covered by the headliner), and completed the metal around the pedal box.  I cut a large hole on the top panel for future access to the pedals, brake cylinders, throttle cable, clutch cable, etc. and I created a panel cover door.  The firewall extension metal will overlap the access door, but I plan to install the firewall extensions with screws to make that removable also. 12 ftbx metal

While the body was off I took apart the dash, removing all gauges and switches, in order to prep the dash pieces for powder-coating..  11.1 dash11 dash

I took the dash pieces to Bonehead Performance in Warrington, PA and selected a flat black wrinkle coating. Here is the dash and switch panel re-assembled after powder-coating.  17 dash

I also took the side-pipes to Bonehead Performance and had them ceramic coated in a silver paint.  The traditional Coupe look is white for the pipes, but I went with silver as a matter of personal choice.

Mark Dougherty (The Travelling Builder) spent a day with me.  We connected the fuel filler neck to the Le Mans gas cap.  FFR provides a metal pipe from the tank which is too long.  I removed it from the fuel tank and we cut it down with the angle grinder.  Then we tossed the straight piece of fuel hose provided by FFR and used a 45 degree one instead.  (Thanks to a post on the forum suggesting the 45 degree hose.)  We also worked through 50% of the A/C system and hoses.  Still more to do there.  One last look at the Coupe before I take it apart for paint.  side-18 drive

Finally, I loaded the coupe on a Uhaul trailer and pulled it to Metal Morphous in North Haven CT.  Here is the Coupe riding my tail.  19 mirror

Ron at MM will do the final fitting of the body, hood and doors, prep and paint (going with the traditional Guardsman Blue with white rally stripes and gumballs),  and will install the spoiler and scoops.  I also asked Ron to install the headliner after paint and before he puts the body back on.  That should save me some pain.

20 at MM

Once Ron has the body and hood off for prep and paint, I may try to bring the chassis back to PA so I can finish off the A/C system, and do a few other things (i.e. install the carpeting, add padding to the roll cage, etc.)  If so, I will have to make another trip to bring the chassis back to him when he is ready to re-install the painted body pieces.

In the meantime, I have some A/C fitting to order, and I need to get some sections of the carpet bound.  I am also using the opportunity to upgrade my garage floor to Racedeck tiles.  Until next update, peace out, or drop the mic, or something trendy.

 

 

 

 

January Update (January 31, 2016)

I was not as productive as I thought I would be in January, perhaps because I lost two weekends to a family vacation (not complaining).

I completed the fuel line and brake lines.  (Perhaps in the next few weeks I will add fluids and see if it holds.)

I purchased tires.  I went with Nitto NT 555 G2.  These are the newer version of the NT 555.  Rears are 315/35/17.  Fronts are 245/45/17.  It was exciting to see them mounted.  I am very happy with how the rims look.  Maybe later I will consider stenciling the “Good Year” billboard lettering.

Tire 1Tires 2

I also purchased and installed a battery.

Battery 1

I am slowly moving forward with the electrical wiring harness connections.  I purchased heavy duty toggles for all functions from Ron Francis, and I am working up a switch panel.  I also purchased a few additional electronic components (clutch safety switch, battery cut-off switch, turn-signal delay box, etc.).

Switches

I worked on the cooling system, connecting the radiator hoses and overflow/expansion tank.

Coolant 1Coolant 2Coolant 3

And this week I am celebrating a birthday.  Check out the amazing cake my wife commissioned at a local bakery.  As much as I enjoyed eating it, I would rather be driving it.

Cake and GCake

 

December Update (December 29, 2015)

More good progress in December.  It may seem like I am jumping around a bit this month, because I am.  🙂

I replaced the FFR-supplied accelerator pedal with a Russ Thompson pedal (much sturdier, and cooler-looking) and installed the matching pads on the brake and clutch pedals.  Note the background – I applied Dynamat sound deadener/thermal barrier to the entire interior of the  passenger compartment.

IMG_5643Back to the sheet metal – I prepared and installed the side and rear walls in the trunk/hatch area.  First I installed aluminum access panels in the sides and rear so I will be able to reach the electrical connections when installing and removing the body.  The panels have nifty little quarter-turn locks.  Then I riveted the walls in place.  (As noted previously, the round holes are for stereo speakers.)

I installed the Hooker gasket and headers.  They look awesome.  (The side exhaust pipes will connect through the body to the headers.)

On to the brake lines.  Thanks to Mark Dougherty  (aka the Travelling Builder) for showing me the way on this.  As noted previously, I am running two brake fluid reservoirs so that the front and rear brake lines run independently (if one fails, hopefully the other does not).  First I installed a block-off plate in the pedal-box firewall with two connectors. Note the temporary rivets (clecos) holding it in place while I fit it.

IMG_5596

Next I connected the reservoirs to the block-off plate, and then behind the firewall I connected the block-off plate to the brake master cylinders.

And then we ran the hard lines.  The front line runs from the master cylinder, to the driver side front, and then over to the passenger-side front.  The rear line runs from the master cylinder, through the transmission tunnel, and then splits to the rear brakes.  Some time soon I will fill the lines with fluid, bleed them for air bubbles and then find out whether my connections are any good!

I took the first step in installing the air-conditioner (made by Vintage Air)- mounting the evaporator unit behind the firewall and under the dash (before the dash is installed).  It is a very tight fit and I suspect that it will be very challenging to get all of the ducts and vents to fit under the dash.

On to the fuel lines.  FFR provides hard lines and pressure connectors.  However, I opted to use flexible braided PTFE fuel lines and connectors by Aeroquip.  First I installed a fuel filter (Fuel Labs).  Then I started the fuel lines.  The lines run as follows:  (1) from the fuel tank to the filter (not done yet, waiting for proper connectors), (2) from the filter, through the transmission tunnel to the engine, (3) from the engine to the fuel regulator (not done yet, waiting for proper connectors), and (4) from the regulator, back through the transmission tunnel and to the fuel tank.

I started the electrical.  FFR provides a very complete and well-labeled wiring harness made by Ron Francis.  I installed the fuse panel under the dash and laid out the harness.  Wires everywhere!!!  I started connecting the obvious ones.  I will start to tackle the others later.  The good news is that the wiring harness came with a separate manual that seems very thorough (much more so than the primary FFR manual).

IMG_5603

I mounted the MSD Atomic electronic fuel injection module on the inside of the firewall.

IMG_5607

On to the cooling system.  I started by mounting the fan on the radiator.

IMG_5608Next I mounted the radiator to the chassis.  Note the angle – one of the unique features of the Daytona Coupe is that the radiator vents up through a large cut-out in middle of the hood.IMG_5632IMG_5633 Mocking up the duct work. IMG_5635IMG_5637Now, duct work done, with weather stripping.

IMG_5639

What’s up next?

  • final connections on the fuel lines
  • coolant system hoses and connections
  • emergency brake connections
  • bleed and test the brake lines
  • electrical connections (lots and lots)
  • a/c, heater
  • dash, gauges and switches
  • mount the seats
  • etc., etc. etc.

If I keep up a good pace, I should be able to start the engine and maybe even “go-kart” the car by February or March.

Happy New Year!